Roofing
Complete roof replacement and new roof installation
Existing covering off, deck reviewed, a new roof system installed. Full replacement and new installation only, quoted as one project with one scope and one start date.
Call (263) 769-8667
Measure
Roof area, pitch, existing layers and access.
Remove
Covering and underlayment come off to the deck.
Deck and underlayment
Sheathing reviewed and replaced where it cannot carry the system, then underlayment and edge metal.
Install
Field material, ridge, ventilation and details.
Systems compared
| System | Typical service life | Suits |
|---|---|---|
| Asphalt shingle | 20-30 years | Most pitched roofs; widest colour range. |
| Standing-seam metal | 40+ years | Simple and complex shapes; concealed fasteners. |
| Clay or concrete tile | 40+ years | Warm climates; framing sized for tile weight. |
Service-life ranges are industry figures for the material, not a guarantee of performance.
Ready to scope the project? Roof area, pitch and the number of existing layers are enough to start.
Call (263) 769-8667What the project includes
- Complete removal of the existing covering and underlayment.
- Sheathing checked, and replaced where it cannot carry the new system.
- Underlayment, drip edge and valley metal before any field material.
- Field shingles or panels, plus ridge cap and hip details.
- Intake and ridge ventilation installed as part of the system.
- Cleanup and disposal of the old covering.
What shapes the quote
- Measured roof area and pitch, taken on site rather than estimated.
- How many existing layers have to come off.
- Roof complexity: hips, valleys, dormers and penetrations.
- Deck condition found once the old covering is removed.
- Material selected and its lead time.
- Access, staging and the number of working days.
Roof replacement questions
Is this full replacement only?
Yes. Complete replacement and new installation. The existing covering is removed rather than recovered, and the quote covers the whole project.
How is the quote built?
Measured roof area and pitch, existing layers to remove, deck condition, ventilation, edge details and site access.
Does sheathing get replaced?
Where it cannot carry the new system, sheathing is replaced as part of the project rather than covered over.
When can the project start?
Scheduling depends on material lead times and weather. The provider confirms the window before the project begins.