Roofing

Complete roof replacement and new roof installation

Existing covering off, deck reviewed, a new roof system installed. Full replacement and new installation only, quoted as one project with one scope and one start date.

Call (263) 769-8667
Two roofers installing tiles across a pitched residential roof
01

Measure

Roof area, pitch, existing layers and access.

02

Remove

Covering and underlayment come off to the deck.

03

Deck and underlayment

Sheathing reviewed and replaced where it cannot carry the system, then underlayment and edge metal.

04

Install

Field material, ridge, ventilation and details.

Systems compared

SystemTypical service lifeSuits
Asphalt shingle20-30 yearsMost pitched roofs; widest colour range.
Standing-seam metal40+ yearsSimple and complex shapes; concealed fasteners.
Clay or concrete tile40+ yearsWarm climates; framing sized for tile weight.

Service-life ranges are industry figures for the material, not a guarantee of performance.

Ready to scope the project? Roof area, pitch and the number of existing layers are enough to start.

Call (263) 769-8667

What the project includes

  • Complete removal of the existing covering and underlayment.
  • Sheathing checked, and replaced where it cannot carry the new system.
  • Underlayment, drip edge and valley metal before any field material.
  • Field shingles or panels, plus ridge cap and hip details.
  • Intake and ridge ventilation installed as part of the system.
  • Cleanup and disposal of the old covering.

What shapes the quote

  • Measured roof area and pitch, taken on site rather than estimated.
  • How many existing layers have to come off.
  • Roof complexity: hips, valleys, dormers and penetrations.
  • Deck condition found once the old covering is removed.
  • Material selected and its lead time.
  • Access, staging and the number of working days.
Workers fastening roof sheathing on an open roof deck
Sheathing is fastened before underlayment and the new covering go down.

Roof replacement questions

Is this full replacement only?

Yes. Complete replacement and new installation. The existing covering is removed rather than recovered, and the quote covers the whole project.

How is the quote built?

Measured roof area and pitch, existing layers to remove, deck condition, ventilation, edge details and site access.

Does sheathing get replaced?

Where it cannot carry the new system, sheathing is replaced as part of the project rather than covered over.

When can the project start?

Scheduling depends on material lead times and weather. The provider confirms the window before the project begins.

Roof replacement service line

(263) 769-8667
Call (263) 769-8667
Call now